Allison Creek Hydro Project Studies

Allison Creek Hydro Project Studies

As part of ongoing efforts for permitting of the Allison Creek Hydro project, in 2012, ABR prepared four management plans for submittal to FERC: Terrestrial Connectivity Plan, Vegetation Management Plan, Avian Protection Plan, and Scavenger & Waste Management Plan. In addition, ABR participated in additional agency consultations as needed, including the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. With USFWS and Hatch, ABR assisted in the development of final measures and best management practices to incorporate into the Copper Valley Electric Association’s transmission corridor.